CLIENT: Novartis Institute for Biomedical Research LOCATION: 181 Mass Ave, Cambridge, MA PROJECT PARTNERS: Skanska USA Building Inc. PROJECT SIZE: $18 million PROJECT MANAGER: Jim Fratto COMPLETED: 2016 This project consisted of performing temporary power and lighting for the entire job site. PROJECT HIGHLIGHTS: Electrical work for the 10 story Building […]
Portfolio Category: Commercial
CLIENT: The Liberty Hotel LOCATION: 215 Charles St, Boston, MA PROJECT PARTNERS: Suffolk Construction PROJECT SIZE: $6 Million PROJECT MANAGER: William Seaver Sr. COMPLETED: 2007 The project consisted of transforming an old jail into a luxury, four-star hotel. Installation of power, telecommunications, lighting, fire alarm and emergency power, along with security […]
CLIENT: Big Night Entertainment LOCATION: 1 Marina Park Drive, Boston, MA PROJECT PARTNERS: Delta Design and Construction Inc. PROJECT SIZE: $660,000 PROJECT MANAGER: Joe McCluskey Jr. COMPLETED: 2012 One of the first high-end restaurants in the growing Seaport district of Boston. The design called for part restaurant and part nightclub. E.G. […]
CLIENT: WGBH Brighton LOCATION: 1 Guest Street, Boston, MA PROJECT PARTNERS: Turner Construction PROJECT SIZE: $11.5 million PROJECT MANAGERS: E.G.S. Joe Carey & LCN Bob Bennett COMPLETED: 2006 PROJECT HIGHLIGHTS: Installed new tel/data infastrucure throughout the buidling Built out all the IDFs with latter trays and equipment racks Installed copper and […]
CLIENT: Marriott Vacation Club Pulse LOCATION: 3 McKinley Square, Boston, MA PROJECT PARTNERS: Walsh Brothers Construction PROJECT SIZE: 87 rooms, 26 floors PROJECT MANAGER: Joe McCluskey Jr. COMPLETED: July 1997 This project consisted of converting a historic building that had stood abandonedfor many years into a luxury Time Share/Hotel. PROJECT HIGHLIGHTS: […]
CLIENT: British Airways LOCATION: Terminal E Logan Airport PROJECT PARTNER: Suffolk Construction PROJECT SIZE: $1,350,000 PROJECT MANAGER: E.G.S. Joe McCluskey Jr. & LCN Tyrone Sandefur COMPLETED: 2017 This project was a design assist with E.G. Sawyer coming on board at the conceptual design stage. E.G. Sawyer worked with the design […]
CLIENT: Beacon Capital LOCATION: 2 Harbor St Boston, MA PROJECT PARTNERS: Suffolk Construction PROJECT SIZE: $20.6 PROJECT MANAGER: Eric Olson EGS & Scott McCluskey LCN COMPLETED: 2024 PROJECT HIGHLIGHTS Electrical & tel-data core & shell work for an 11 story building, fit-out of lobby, parking garage and amenity spaces. Dual […]
CLIENT: Boston Global Investors LOCATION: 10 World Trade Center Boston, MA PROJECT PARTNERS: Suffolk Construction PROJECT SIZE: $22.5M Electrical, $1.5M low voltage PROJECT MANAGER: Joe Carey EGS & Tyrone Sandefur LCN COMPLETED: 2025 PROJECT HIGHLIGHTS Core and Shell building 17 total stories, 600,000+ sqft Electrical Infrastructure provided during this project […]
CLIENT: Encore Casino LOCATION: 1 Broadway St Everett, MA PROJECT PARTNERS: Suffolk Construction PROJECT SIZE: $27M electrical, $18M low voltage PROJECT MANAGER: Joe Carey EGS, Bob Bennett LCN COMPLETED: 2019 PROJECT HIGHLIGHTS · Electrical scope of work for complete build out of the Central Utility Plant and for the parking […]
CLIENT: MITIMCO / US Department of Transportation LOCATION: Kendall Square, Cambridge, MA PROJECT PARTNERS: Turner Construction Company PROJECT SIZE: $15M PROJECT MANAGER: Tyrone Sandefur ASSISTANT PROJECT MANAGER: Scott McCluskey PROJECT ENGINEER: Michael O’Neill Jr., RCDD COMPLETED: 2024 The project included complete CommScope Structured Cabling System, including Cat6a 4 pair horizontal copper, […]